Building site to Bathroom

Full bathroom fit. Every item has been relocated and a shower has been installed. All pipework hidden under the floor. Fully plastered. Metro white tiles on the walls and white tiles on the floor with a gunmetal grout. Spotlights installed with a spotlight extractor above the shower. We also built a new cupboard in the corner of the room to hide the boiler and provide additional storage space. The end product is a very clean and crisp traditional bathroom

11141354_1893594664199913_1276868017781256130_o 11728998_1893594544199925_4152113283203748782_o 11755156_1893594560866590_3689533044970298822_n

11722422_1893594827533230_1529503943373723714_o 10484217_1893594810866565_7625918409854415116_o 11696423_1893594657533247_4149004818166769550_o (1)

11742656_1893594800866566_3634378676100883603_n 11219686_1893594724199907_4199019962705753488_n 11707758_1893594734199906_5776049277139409037_n

Leave a Reply

Your email address will not be published. Required fields are marked *